9th June 2017 to 7th July 2017

The first two graphs show the total vehicle movements and breakdown by speed / time for the duration the sign was in position. This is then followed by the daily breakdowns.

Daily Breakdown

The sign was put in place towards lunchtime.

Sign was taken down in the morning, hence charting is only available until 9.00am